Inspection and Functional Test Summary · 9 May 2026

Overview

The NAVIJET C500E-III high-pressure cleaner was inspected to verify the electrical motor condition and determine the cause of pressure failure during operation. Electrical readings confirmed that the motor winding and insulation condition remained acceptable. However, functional testing showed that the unit failed to generate pressure during operation.

General view of NAVIJET C500E-III high-pressure cleaner
Figure 1 – General view of the NAVIJET C500E-III high-pressure cleaner.
Electrical cabinet inspection Internal wiring arrangement
Figure 2 – Electrical cabinet inspection and internal wiring arrangement.
Test instruments connected during electrical inspection
Figure 3 – Test instruments connected during electrical inspection.
Nameplate and pressure gauge assembly
Figure 4 – Nameplate and pressure gauge assembly.
Hydraulic pump assembly inspection view
Figure 5 – Hydraulic pump assembly inspection view.
Corroded unloader valve and pressure line assembly
Figure 6 – Corroded unloader valve and pressure line assembly.
Bassnet requisition overview Bassnet requisition details
Figure 7 – Maintenance requisition reference for deck department
Bassnet 2.11 CNV-26V-0098 High Pressure Cleaner – Deck Department
Electrical Test Readings
Test Item Reading Assessment
Winding Resistance U-V0.8ΩBalanced
Winding Resistance U-W0.8ΩBalanced
Winding Resistance V-W0.8ΩBalanced
Insulation Resistance U-E4000MΩGood
Insulation Resistance V-E4000MΩGood
Insulation Resistance W-E4000MΩGood

Functional Test and Conclusion

After confirming acceptable motor condition, fresh water and power supply were connected to the unit. The motor was operated for approximately three minutes. During the test, the pressure gauge remained at 0 bar with no sign of pressure build-up.

The hydraulic assembly, including the high-pressure pump, unloader valve, and safety release valve, showed heavily external rust and corrosion. Tried to adjust, but no changes in pressure. Based on the inspection and operational test, the hydraulic pump assembly was identified as the defective section requiring repair or replacement of the requested parts.